Question: need b and d A machine makes two components, call them types A and B. It takes 510 seconds to switch production between the component

need b and d
need b and d A machine makes two components, call
A machine makes two components, call them types A and B. It takes 510 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 4 seconds, or 15 units per minute a. Suppose the machine rotates between one batch of 2040 units of A and 2040 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B2 40 component pairs per minute b. 200 percent Suppose the machine rotates between one batch of 2040 units of A and 2040 units of B. What is the utilization of the machine? Suppose the machine rotates between one batch of 2040 units of A and 2046 units of B. What is the average inventory of B components? 4 C. 893 units d. If the production schedule could be adjusted with the goal of minimizing Inventory in the process, how many units of A should be produced before switching to component B7 Assume the same number of units of B would be produced as well 1,086 units

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!