Question: I need step by step working for part G and H. thanks. Java book E. Code A company is designing a product layout for a

I need step by step working for part G and H.

I need step by step working for part G and H.

I need step by step working for part G and H. thanks.

Java book E. Code A company is designing a product layout for a new product. It plans to use this production line 8 hours a day in order to meet a schedule of 400 units per day. The tasks necessary to produce this product are detailed in the table below. Task Predecessor Time (seconds) A 50 B 36 C 26 D 22 E B, D 70 F CE 30 a. (1 pt) What is the required cycle time in seconds) in order to meet the schedule? 72 b. (1 pt) What is the theoretical minimum number of workstations needed to meet the schedule? 4 c. (1 pt) Assign tasks to workstations using the longest processing time heuristic and if there is a tie break the ties according to alphabetical order. (i.e., if tasks E and F both are eligible and have the same number of following tasks, then choose E first). Work Station 1 includes the tasks: A Mark 0.00 out of 1.00 d. (1 pt) Work Station 2 includes the tasks: B X Mark 0.00 out of 1.00 e. (1 pt) Work Station 3 includes the tasks: CD VX f. (1 pt) Work Station 4 includes the tasks: E Mark 0.00 out of 1.00 Activate Windows Go to Settings to activate Window g (2 pts) What is the total idle time of the balance obtained in part d? 58 X 12 nts What is the efficienaviin nercent of the balance obtained in partida enteravuresnanse as a whole number 04 CE 30 a. (1 pt) What is the required cycle time in seconds) in order to meet the schedule? 72 b. (1 pt) What is the theoretical minimum number of workstations needed to meet the schedule? 4 C. (1 pt) Assign tasks to workstations using the longest processing time heuristic and if there is a tie break the ties according to alphabetical order. (i.e., if tasks E and F both are eligible and have the same number of following tasks, then choose E first). Work Station 1 includes the tasks: A vix Mark 0.00 out of 1.00 d. (1 pt) Work Station 2 includes the tasks: B vX Mark 0.00 out of 1.00 e. (1 pt) Work Station 3 includes the tasks: CD VX f. (1 pt) Work Station 4 includes the tasks: E vX Mark 0.00 out of 1.00 g. (2 pts) What is the total idle time of the balance obtained in part d? 58 X h. (2 pts) What is the efficiency (in percent) of the balance obtained in part d? (enter your response as a whole number) 94

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!