Question: I need the P3 answer P3. Consider a project with activities given in the table below, construct the activity-on-arrow network diagram Immediate Predecessor A Activity

I need the P3 answer P3. Consider a project with

I need the P3 answer

P3. Consider a project with activities given in the table below, construct the activity-on-arrow network diagram Immediate Predecessor A Activity A B C D E F G H I (End) B C DE EF G, II, I P4. Consider the AON network diagram below. AD D CD ED 4.D a) Perform the forward and backward pass analysis on the diagram. b) What is the critical path and its duration? c) Which activity activities has/have different total slack and free slack