I. Project Scheduling and Resource Leveling
Using the data below, create the project schedule network diagram and level the overloads for resources.
tableActivity,tableImmediatePredecessortableDuration inDaysResourceAEvaluate freezers,,AlcidesBChart temperatures,,JoanCReview service record,,AlcidesDConsult with HVAC engineer,ABCAlcidesEDevelop construction plan,DJoanFComplete IC assignment,EAlcidesGComplete ROI analysis,EJoanHConduct regulatory review,EJoanItableObtain constructionapprovalFGHAlcides
a Create a complete project scheduling network diagram using activity durations and immediate predecessor. Insert the image of the schedule below.
b Develop a recourse loading table for both Alcides and Joan. Assume they need to work on the activity for hours whenever assigned for the project. Identify the days that they are overloaded work more than hours Implement the resource leveling method to solve the overload issues. Provide explanations and suggestions if any overload cannot be resolved.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock