Question: Implement the double-time arrival modification to Model 3-1 discussed in Section 2.6.3 by opening the Create module and changing the Value 5 to 2.5 for

Implement the double-time arrival modification to

Implement the double-time arrival modification to Model 3-1 discussed in Section 2.6.3 by opening the Create module and changing the Value 5 to 2.5 for the mean of the exponential distribution for Time Between Arrivals (don't forget to click OK, rather than Cancel, if you want this change to happen). Make five replications and compare the results to what we got in the hand simulation (see Figure 2-4). Put a Text box inside your .doe file; remember to hit CTRL-Return inside an Arena text box to go to the next line (if you just hit Return it will close out the text box and change the cursor to crosshairs for you to place the box); alternatively, you may want to compose your comparison outside of Arena, in, say, Notepad or some other plain- text editor (not in word-processing software), then copy/paste that into an Arena Text box. To see the results for each of the five replications individually, you'll need to open the Category by Replication report. Total production O @ A A 0 5 10 Average waiting time in queue O AAA 0 10 Average total time in system (0) A 0 5 10 Time-average no. parts in queue CONDO M 0 5 10 Drill-press utilization 0 O O 0.0 0.5 1.0 Figure 2-4. Comparing the Original (Circles) and Double-Time Arrival (Triangles) Systems (Replication 1 Is Filled In, and Replications 2-5 Are Hollow)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!