Question: in a construction project, the field moist unit weight was 1 8 . 0 8 k N m 3 at a moisture content of 8

in a construction project, the field moist unit weight was 18.08kNm3 at a moisture
content of 8%. If maximum and minimum dry unit weight determined in the
laboratory were 16.93kNm3 and 14.46kNm3, respectively, what was the field rel-
ative density?