Question: In an operating system, processes A / B / C have the following maximum designed capacity: A = 1600 units / B = 1550 units
In an operating system, processes A / B / C have the following maximum designed capacity: A = 1600 units / B = 1550 units / C = 1800 units. If the actual measured output is 1400 units, what is the system efficiency?