Question: In Class Project - 02/18/2023 First, develop a plan, then assign tasks and obtain hardware. After assigning all the tasks start programming. Install hardware after
In Class Project - 02/18/2023 First, develop a plan, then assign tasks and obtain hardware. After assigning all the tasks start programming. Install hardware after obtaining them. Start testing the programs after completion of the program. After installing hardware, start writing the user manual and converting existing files. Begin system test when programs are successfully tested. User testing can begin when both user manuals are authored, and files are converted. Lastly, begin user testing after both systems testing and user training are successfully completed. Identify all tasks and create WBS (Use Figure 3-6 as a reference) - Create a table with task \#, description, duration in days, and predecessor tasks (Use Figure 3-7 as a reference) Use the formula to calculate the estimated task duration for each task Create a PERT/CPM chart - Identify Critical Path In Class Project - 02/18/2023 First, develop a plan, then assign tasks and obtain hardware. After assigning all the tasks start programming. Install hardware after obtaining them. Start testing the programs after completion of the program. After installing hardware, start writing the user manual and converting existing files. Begin system test when programs are successfully tested. User testing can begin when both user manuals are authored, and files are converted. Lastly, begin user testing after both systems testing and user training are successfully completed. Identify all tasks and create WBS (Use Figure 3-6 as a reference) - Create a table with task \#, description, duration in days, and predecessor tasks (Use Figure 3-7 as a reference) Use the formula to calculate the estimated task duration for each task Create a PERT/CPM chart - Identify Critical Path
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
