Question: In the PERT project scheduling technique, each activity requires three time estimates (optimistic, most likely, and pessimistic) so that the expected time can be calculated.
In the PERT project scheduling technique, each activity requires three time estimates (optimistic, most likely, and pessimistic) so that the expected time can be calculated. Assuming a beta probabilit