In this assignment, we will consider the supply availability of the real-time tactical reconnaissance system (Reccelite)....
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
In this assignment, we will consider the supply availability of the real-time tactical reconnaissance system (Reccelite). The Reccelite is an electro-optical (Infra-Red+CCD-TV) tactical reconnaissance pod designed to operate 24 hours a day in adverse weather conditions, see separate leaflet for detailed system characteristics. The Ministry of Defense of NATO country on behalf of its Royal Air Force signed a $40 million contract for Reccelite reconnaissance pods few years ago. This equipment was installed at military aircraft for surveillance purposes. The Royal Airforce owns and uses 6 pods. All pods are maintained at a single location, namely in the Air Force base. Five critical parts of the Reccelite pod are maintained by replacement upon failure. Each pod contains exactly one piece of each critical part. Failed parts are repaired at the supplier, and the repair lead times tend to be long. Currently, the Airforce does not have its own facilities to perform repairs on the Reccelite pod. The table below gives the key part characteristics. N Part Front Section (sensor payload) Power Unit Video Unit Airborne Antenna Environmental unit Cost (x 1000 Euro) 1498 35 311 132 91 failure rate / yr. Multiplicity 0.308 0.020 0.225 0.085 0.027 1 1 HH 1 1 H Supplier repair Gross lead time ship time repair (yr.) supplier base TPT (yr.) 0.05 0.79 0.30 0.47 0.59 0.30 0.74 0.25 0.42 0.54 0.25 Order-and- 0.05 0.05 0.05 0.05 Note that the supplier repair lead time is defined as the time between failure at the base and the completion of the repair of the supplier. So, the repair lead time covers (i) the time to ship the failed parts from the base to the supplier, and (ii) the repair throughput time at the supplier. The order-and-ship time is the time needed to send an as-good-as- new part from the supplier to the base. Question 1 As an initial solution to the spare part stocking problem, consider the policy that all parts should satisfy the same constraint on the expected backorders, namely the expected backorders per item may not exceed 0.05. Which spare part levels correspond to this policy? What is the corresponding investment in spare parts? What is the logistics system availability? Question 2 Use the "biggest bang for the buck" heuristic to find a set of efficient combinations of logistics system availability and spare part investment. Show these points in a graph, and show your solution to question 1 in the same figure. a) which reduction in spare part investment is possible if we wish to attain the same logistics system availability as in Question 1? b) Which improvement in logistics system availability is feasible for the spare part investment that you found in Question 1? Question 3 Other NATO countries are using the same Reccelite pod or consider using it in the near future. An example is Italy who owns four unmanned air vehicles for which it wants to procure the Reccelite pod. To improve efficiency, NATO countries are reconsidering their spare part supply chain for shared equipment like the Reccelite pod. Consider the following option: (i) The supplier holds a pool of shared spare parts for multiple NATO countries (ii) Both countries may have their own local spare part inventories (this for example located at their air base), (iii) Upon failure, a part will be replaced by a spare part from local stock if available. The failed part will be sent to the supplier for repair, and at the same time a new part will be ordered. This part will be supplied from the supplier's shared stock, if available. a) What are the recommended stock levels at each of these countries if there are no shared spare part inventories at the supplier? Consider a target value for the logistics system availability of 0.97. b) What are the recommended stock levels at the each of these countries, and at the supplier if they are willing to set up a shared pool of spare parts? What is the reduction in spare part inventory investment? Note that the data are the same as in the table above. That is, the order-and-ship time from supplier to each country is equal to 0.05 years, the failure rates are the same, and the supplier repair times in the table above apply for all repairs (originating from both countries). As we have a two-echelon model, you should use METRIC. In this assignment, we will consider the supply availability of the real-time tactical reconnaissance system (Reccelite). The Reccelite is an electro-optical (Infra-Red+CCD-TV) tactical reconnaissance pod designed to operate 24 hours a day in adverse weather conditions, see separate leaflet for detailed system characteristics. The Ministry of Defense of NATO country on behalf of its Royal Air Force signed a $40 million contract for Reccelite reconnaissance pods few years ago. This equipment was installed at military aircraft for surveillance purposes. The Royal Airforce owns and uses 6 pods. All pods are maintained at a single location, namely in the Air Force base. Five critical parts of the Reccelite pod are maintained by replacement upon failure. Each pod contains exactly one piece of each critical part. Failed parts are repaired at the supplier, and the repair lead times tend to be long. Currently, the Airforce does not have its own facilities to perform repairs on the Reccelite pod. The table below gives the key part characteristics. N Part Front Section (sensor payload) Power Unit Video Unit Airborne Antenna Environmental unit Cost (x 1000 Euro) 1498 35 311 132 91 failure rate / yr. Multiplicity 0.308 0.020 0.225 0.085 0.027 1 1 HH 1 1 H Supplier repair Gross lead time ship time repair (yr.) supplier base TPT (yr.) 0.05 0.79 0.30 0.47 0.59 0.30 0.74 0.25 0.42 0.54 0.25 Order-and- 0.05 0.05 0.05 0.05 Note that the supplier repair lead time is defined as the time between failure at the base and the completion of the repair of the supplier. So, the repair lead time covers (i) the time to ship the failed parts from the base to the supplier, and (ii) the repair throughput time at the supplier. The order-and-ship time is the time needed to send an as-good-as- new part from the supplier to the base. Question 1 As an initial solution to the spare part stocking problem, consider the policy that all parts should satisfy the same constraint on the expected backorders, namely the expected backorders per item may not exceed 0.05. Which spare part levels correspond to this policy? What is the corresponding investment in spare parts? What is the logistics system availability? Question 2 Use the "biggest bang for the buck" heuristic to find a set of efficient combinations of logistics system availability and spare part investment. Show these points in a graph, and show your solution to question 1 in the same figure. a) which reduction in spare part investment is possible if we wish to attain the same logistics system availability as in Question 1? b) Which improvement in logistics system availability is feasible for the spare part investment that you found in Question 1? Question 3 Other NATO countries are using the same Reccelite pod or consider using it in the near future. An example is Italy who owns four unmanned air vehicles for which it wants to procure the Reccelite pod. To improve efficiency, NATO countries are reconsidering their spare part supply chain for shared equipment like the Reccelite pod. Consider the following option: (i) The supplier holds a pool of shared spare parts for multiple NATO countries (ii) Both countries may have their own local spare part inventories (this for example located at their air base), (iii) Upon failure, a part will be replaced by a spare part from local stock if available. The failed part will be sent to the supplier for repair, and at the same time a new part will be ordered. This part will be supplied from the supplier's shared stock, if available. a) What are the recommended stock levels at each of these countries if there are no shared spare part inventories at the supplier? Consider a target value for the logistics system availability of 0.97. b) What are the recommended stock levels at the each of these countries, and at the supplier if they are willing to set up a shared pool of spare parts? What is the reduction in spare part inventory investment? Note that the data are the same as in the table above. That is, the order-and-ship time from supplier to each country is equal to 0.05 years, the failure rates are the same, and the supplier repair times in the table above apply for all repairs (originating from both countries). As we have a two-echelon model, you should use METRIC.
Expert Answer:
Answer rating: 100% (QA)
1To determine spare part levels you would need data on demand distribution for each item lead times ... View the full answer
Related Book For
Smith and Roberson Business Law
ISBN: 978-0538473637
15th Edition
Authors: Richard A. Mann, Barry S. Roberts
Posted Date:
Students also viewed these general management questions
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Planning is one of the most important management functions in any business. A front office managers first step in planning should involve determine the departments goals. Planning also includes...
-
In this study researchers found a correlation between the cleanliness of the homes children are raised in and the years of schooling completed and earning potential for those children What...
-
Compare and contrast special and common causes of variation.
-
Cape Town Manufacturing had the following income statement and balance sheet items (in millions of rands, the South African currency): Income Statement For the Year Ended December 31, 20X1 Sales...
-
Discuss how a manager might make sure that the performance plan for each of her direct reports was driven by organizational strategy and the business plan. How can information systems support this...
-
Describe the flow of budget data in an organization. Who are the participants in the budgeting process, and how do they participate?
-
Discuss the 4 types of dividends.Whichof the 4 isused most often, and why?What may happen to a company's share price when dividends areannounced orpaid?Why do you think this is so?
-
Auditor Changes at Daily Journal Corporation Charlie Munger is vice chairman of Berkshire Hathaway Inc. and is informally known as War- ren Buffett's "right arm." Munger also serves as chairman of...
-
Aditi Patel currently holds tax-exempt bonds of Good Samaritan Healthcare that pay 7 percent interest. She is in the 40 percent tax bracket. Her broker wants her to buy some Beverly Enterprises...
-
The after-tax operating cash flows in euros for the Fontenot Company are: A. 50 in both years. B. 70 in both years. C. 85 in both years. Linda Pyle is head of analyst recruiting for PPA Securities....
-
Erin Chou is reviewing a profitable investment project that has a conventional cash flow pattern. If the cash flows for the project, initial outlay, and future after-tax cash flows all double, Chou...
-
Here are the 2015 revenues for the Wendover Group Practice Association for four different budgets (in thousands of dollars): a. What do the budget data tell you about the nature of Wendovers...
-
Theresa Davis is in the 40 percent personal tax bracket. She is considering investing in HCA (taxable) bonds that carry a 12 percent interest rate. a. What is her after-tax yield (interest rate) on...
-
Find each determinant below. Is the associated matrix nonsingular and does its inverse exist? 1 2 31 |1 1 4 11 4 18 a) |A| = 4 16 la e) |E| = |b = 16 1 31 0 1 b) |B| = 4 0 31 13 b cl |x C a f) |F|= 3...
-
Provide a draft/outline of legal research involving an indigenous Canadian woman charged with assault causing bodily harm under (Sec 267b) of the Criminal Code, where the crown wants a 12-month jail...
-
Case Summary Defendants-Appellants, Sam Yin (Yin) and Sophia Kung (Kung) appeal from the grant of partial summary judgment in favor of Plaintiff-Appellee, Society National Bank (Society). We reverse...
-
The sole question presented in this case is which of several claimants is entitled to an award for information leading to the apprehension and conviction of certain bank robbers. * * * On June 12th...
-
Dryden, a certified public accountant, audited the books of Elixir, Inc., and certified incorrect financial statements in a form that was filed with the Securities and Exchange Commission. Shortly...
-
Zachary and Carrie Sexton (the Buyers) were searching for a home in the Kings wood neighborhood of Atlanta, Georgia. The Buyers real estate agent learned that Russell and Linda Sewell (the Sellers)...
-
The Anchor Glass Container Corporation and its parent company, Consumers Packaging, Inc. (CPI), entered into a series of agreements with Encore Glass, Inc., to supply glass containers of a specific...
-
Washington Tennis & Education Foundation, Inc. (WTEF) is a nonprofit organization operating in the District of Columbia that provides athletic and academic programs for children from low-income...
Study smarter with the SolutionInn App