Question: industrial system simulation: Initially (time 0) empty and idle ( Base time units: minutes Input data (assume given for now ...), in minutes: Part Number
industrial system simulation:
Initially (time 0) empty and idle ( Base time units: minutes Input data (assume given for now ...), in minutes: Part Number Interarrival Time TOOOOO AWN+ Arrival Time 0.00 1.73 3.08 3.79 4.41 18.69 19.39 34.91 38.06 39.82 40.82 1.73 1.35 0.71 0.62 14.28 0.70 15.52 3.15 1.76 1.00 Service Time 2.90 1.76 3.39 4.52 4.46 4.36 2.07 3.36 2.37 5.38 9 10 11 Problem 1: Using the same example solved in class, calculate the following Performance Measure of the system when 35 minutes of (simulated) time have passed. Value Performance Measure Total production Average waiting time in queue Maximum waiting time in queue Average total time in system Maximum total time in system Time-average number of parts in queue Maximum number of parts in queue Drill-press utilization

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
