Question: Interarrival Time and Service Time in a simulation study for a bank system are shown in the following table: Interarrival Time (min) 2 1 6
Interarrival Time and Service Time in a simulation study for a bank system are shown in the following table:
| Interarrival Time (min) | 2 | 1 | 6 | 3 | 6 | 4 | 2 | 4 | 1 |
| Service Time (min) | 4 | 3 | 4 | 5 | 1 | 5 | 3 | 2 | 4 |
If the simulation runs for 1 hour, build the simulation table and the scheduling table for first 20mins. You need to perform, FEL, Service Time, Idle/Busy Status, Queue Length, and so on.
Step by Step Solution
3.57 Rating (168 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts