Question: IT 508 Home Work No. 5 (1) Multiple Activity Chart: Determine the number of machines to be assigned to an operator. The setup time is

IT 508 Home Work No. 5 (1) Multiple Activity

IT 508 Home Work No. 5 (1) Multiple Activity Chart: Determine the number of machines to be assigned to an operator. The setup time is 2.5 mins and the run time is 6 mins. Machine can run automatically without supervision. Assume walking time is negligible between the machines. Operator rate is $20/hour and machine rate is $50/hour. Draw the multiple activity chart and show the two appropriate combinations of the assignment