Question: It is required to build a UASB reactor on a laboratory scale. This UASB reactor will work with industrial wastewater. Anaerobic granular sludge from a

It is required to build a UASB reactor on a laboratory scale. This UASB reactor will work with industrial wastewater. Anaerobic granular sludge from a full-scale wastewater treatment plant will be used as inoculum for the UASB reactor. The methanogenic activity test results of the sludge that will be inoculated into the UASB reactor are shown in table.
Digester for test:
Volume =500ml
Sludge =5g SV/L in the digester
Additional data:
Temperature =30\deg C, pressure =1 atm
Total sludge solids =180 g/L, of which 30% are volatile solids (VS)
Determine:
a) The methanogenic activity of the sludge in gCOD/gSV*ia
b) Volume of the laboratory's UASB reactor. Calculate the volume of sludge that must be introduced as inoculum to the UASB reactor to obtain the desired initial sludge concentration.
c) Hydraulic retention time in the laboratory's UASB reactor.
1Tiempo(hr)VCH4(ml)001.2557.3532.57.7537.58.02541.58.4547.58.65518.9549.5649.6566.59.957210.58111.8510612.0510912.311319.4158.520.3159.5
 It is required to build a UASB reactor on a laboratory

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!