Question: Kata Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, Kata expected to incur

 Kata Systems allocates manufacturing overhead based on machine hours. Each connector

Kata Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, Kata expected to incur the following: 800 machine hours per month (80 connectors x 10 machine hours per connector) $5,000 in variable manufacturing overhead costs $6.210 in foxed manufacturing overhead couts During August, Kata actually used 500 machine hours to make 120 connectors and spent $5,300 in variable manufacturing costs and $7,200 in fixed manufacturing overhead costs. Kata's standard variable manufacturing overhead allocation rate is O A 58.25 per machine hour OB. $14.01 por machine hou C. 57.76 per machine hour OD 510.00 per machine hour

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!