Question: Lab Assignment Run model for 100 hour In wood industry facility, tables are manufactured as follow: Work in pairs. Tables consists of four wooden

Lab Assignment Run model for 100 hour In wood industry facility, tablesare manufactured as follow: Work in pairs. Tables consists of four woodenlegs, two long connection bars, two short connection bars, and top surface.

Lab Assignment Run model for 100 hour In wood industry facility, tables are manufactured as follow: Work in pairs. Tables consists of four wooden legs, two long connection bars, two short connection bars, and top surface. One short connection bar is connected with two legs [Normal (3, 0.5) min], and then two resulted subassemblies are connected using two long bars [Normal (4, 0.75) min]. Finally, top surface is fixed over two subassemblies [Normal (3, 1) min]. Each process requires one worker, some stations requires a machine operated by an operator Ten Long wood bars are delivered from the warehouse at 7:15 am each two days, 30% is used to cut long connections, 30% to cut short connections, and 40% to cut legs. Four Top surface RM is delivered at 6:45 am each two days.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!