Question: Level 0 operations: Leadtime = 0 Level 1 operations: Leadtime = 1 week Level 2 operations: leadtime = 1 week from level 1 (that is

Level 0 operations: Leadtime = 0

Level 1 operations: Leadtime = 1 week

Level 2 operations: leadtime = 1 week from level 1 (that is these operations occur 1 week prior to level 1 operations)

Design a plan using Resource Profile base on the data given.

Level 0 operations: Leadtime = 0 Level 1

hrs/unit Capacity Usin: LPUF and capacity bills, Tor next 4 weeks based on the MPS, and determine wilen n a A. Products Backboard post set F. Routings and time Standards (hours/unit) Volleyball post set Package backboard post set Assembly B. Plant Work Centers Capacities (in terms of employees and hrs) Manufacture upright 001- Sawing 12 e 40 hrs 002. Bending 20 @ 40 hrs Bending 003- Drilling 5 40 hrs Welding 004- Milling 5 @ tirs Manufacture Crossbar 005- Welding 10 @ 40 hrs Welding 006- Assembly 5 @ 40 hours Manufacturing shaft C. Master Production Schedule Sawing Product WK1 WK 2 WK 3 WK4 Bending Backboard post sets1000 1200800 800 Welding Volleyball post sets 800 600 600 1000 Sawing Manufacture plate next to post D. Historical Work Center Percentage 001- Sawing Sawing 002- Bending 30% Drilling 003- Drilling Manufacture plate next to backboard 004- Milling 10% Sawing 005- Welding 20% Milling 006- Assembly 10% Package backboard post hardware E. Manufacturing Bill of Materials (excluding raw materials) Assembly **Standard hours per blackboard Backboard post set (package) Package volleyball post set Upright (manufacture) Assembly Crossbar (weld on plates) Manufacture posts (each package requires two posts) Shaft (manufacture) Bending Plate next to post (manufacture) Welding Hardware package (package) Drilling Package volleyball post hardware Volleyball post set (package) Assembly Posts (manufacture) **Standard hours per volleyball post set Hardware package (package) 20% 10% 0.05 1.6 hours 0.1 0.2 0.1 0.05 clof 0.05 0.85 hours resaren profile hrs/unit Capacity Usin: LPUF and capacity bills, Tor next 4 weeks based on the MPS, and determine wilen n a A. Products Backboard post set F. Routings and time Standards (hours/unit) Volleyball post set Package backboard post set Assembly B. Plant Work Centers Capacities (in terms of employees and hrs) Manufacture upright 001- Sawing 12 e 40 hrs 002. Bending 20 @ 40 hrs Bending 003- Drilling 5 40 hrs Welding 004- Milling 5 @ tirs Manufacture Crossbar 005- Welding 10 @ 40 hrs Welding 006- Assembly 5 @ 40 hours Manufacturing shaft C. Master Production Schedule Sawing Product WK1 WK 2 WK 3 WK4 Bending Backboard post sets1000 1200800 800 Welding Volleyball post sets 800 600 600 1000 Sawing Manufacture plate next to post D. Historical Work Center Percentage 001- Sawing Sawing 002- Bending 30% Drilling 003- Drilling Manufacture plate next to backboard 004- Milling 10% Sawing 005- Welding 20% Milling 006- Assembly 10% Package backboard post hardware E. Manufacturing Bill of Materials (excluding raw materials) Assembly **Standard hours per blackboard Backboard post set (package) Package volleyball post set Upright (manufacture) Assembly Crossbar (weld on plates) Manufacture posts (each package requires two posts) Shaft (manufacture) Bending Plate next to post (manufacture) Welding Hardware package (package) Drilling Package volleyball post hardware Volleyball post set (package) Assembly Posts (manufacture) **Standard hours per volleyball post set Hardware package (package) 20% 10% 0.05 1.6 hours 0.1 0.2 0.1 0.05 clof 0.05 0.85 hours resaren profile

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!