Question: Machine Process Number Setup Processing Time Time of Batch Size System (Fruit Capacity Baskets) (Fruit Baskets/ workers hr) Air Injection Machine Inflating Mold as per


Machine Process Number Setup Processing Time Time of Batch Size System (Fruit Capacity Baskets) (Fruit Baskets/ workers hr) Air Injection Machine Inflating Mold as per shape of fruit. 1 hr 6 seconds/fruit 9000 ? Assembly/Packaging Putting toy fruits in a basket and 1 minute/fruit 2 basket packing. a Co in the furnace. Fruit Basket consists of s fruits: Banana, Apple, Preapple poar, and Avecado. In Single set up J trays sisting OP 30 nolds each are put The molded fruit is prepared in is minutes. Thus, setup for the trust is completed is time processting (1516)/5x30 = 1/60 which is = 1/400 which is equal to 6 sec/truit. To cater demand the batch 5.735 9000. There are a workers and each tar es 1 assemble and pack fruits. Thus the assembly time is 1 minttrust basket a +0 At 1. If the batch size of truit basteets Es 9000 units, what 13 the overall system capacity PRT mamtastere trust baskets? What is the bottlenek? 2. If the market demand rate of fruit baskets is loo units/hr, was purchase of Injerton machine insutred by 'nsrofred by PRT? It, however, PRT? It, however, the demand rate is 150 units/hr, what is the cycle time? For a demand rate of 150 150 uniththr, what 15 the best way for Par to increase system capacity to 150 unots/hr? Machine Process Number Setup Processing Time Time of Batch Size System (Fruit Capacity Baskets) (Fruit Baskets/ workers hr) Air Injection Machine Inflating Mold as per shape of fruit. 1 hr 6 seconds/fruit 9000 ? Assembly/Packaging Putting toy fruits in a basket and 1 minute/fruit 2 basket packing. a Co in the furnace. Fruit Basket consists of s fruits: Banana, Apple, Preapple poar, and Avecado. In Single set up J trays sisting OP 30 nolds each are put The molded fruit is prepared in is minutes. Thus, setup for the trust is completed is time processting (1516)/5x30 = 1/60 which is = 1/400 which is equal to 6 sec/truit. To cater demand the batch 5.735 9000. There are a workers and each tar es 1 assemble and pack fruits. Thus the assembly time is 1 minttrust basket a +0 At 1. If the batch size of truit basteets Es 9000 units, what 13 the overall system capacity PRT mamtastere trust baskets? What is the bottlenek? 2. If the market demand rate of fruit baskets is loo units/hr, was purchase of Injerton machine insutred by 'nsrofred by PRT? It, however, PRT? It, however, the demand rate is 150 units/hr, what is the cycle time? For a demand rate of 150 150 uniththr, what 15 the best way for Par to increase system capacity to 150 unots/hr