Question: Master of Engineering Management Program MEM506 (Simulation HW3) Multiple Server System Simulation You are an engineering manager in charge of a service center where customers

Master of Engineering Management Program MEM506Master of Engineering Management Program MEM506

Master of Engineering Management Program MEM506 (Simulation HW3) Multiple Server System Simulation You are an engineering manager in charge of a service center where customers arrive to the center with an arrival rate 2 = 24 customer/hr. As shown in below figure, the service center has a single queue and 3 parallel service stations each with a service rate u= 10 customer/hr. Both inter-arrival and service times are exponentially distributed. Server 1 Arrival Queue Server 2 Build an ARENA simulation model of the service center Name the ARENA model with your name Show a screen shot of details of each model element (Create, Process, etc.) and include your name in the name of these elements. - Show the complete model picture. Run the model for 40 hours (one week) of operation and obtain results report (replications are 5 and replication time is 8 hours). Study and understand all the elements of the simulation report and include the report of simulation results in the appendix. - Use the simulation results to estimate the averages of same 5 KPIs. Compare QM to ARENA simulation results and show differences (Use a table to compare results). What can you do to improve the accuracy of ARENA simulation results? Show the improved results after action taken. - Use ARENA to sketch one server utilization with run time (40 hrs), what do you conclude

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!