Question: Modelling simulation Queueing System with One Server Assume a queue simulation system with a processing machine. The time between the arrival times and processing of
Modelling simulation
Queueing System with One Server
Assume a queue simulation system with a processing machine. The time between the arrival times and processing of raw materials for the queuing system is shown in table 1 below. Construct a simulation table, from clock simulation t = 0 to t = 20 (units = minutes). During the simulation starts at t = 0, there is an entity of the previous shift is being processed by the machine that will end the processing at time t = 4 minutes. Then find the answers to the following questions:
a. Total idle time
b. Average customer waiting time in the system
Table 1: The time between arrival and processing times
| Raw Materials | 1 | 2 | 3 | 4 | 5 | 6 |
| Time between arrival (minit) | - | 2 | 13 | 2 | 2 | 3 |
| Processing times (minit) | 2 | 3 | 2 | 5 | 2 | 3 |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts