Question: n 2 5 Recall the development plans previously described: 3 4 6 - acre plot of forested area Recreation space: 2 9 % of the

n25
Recall the development plans previously described:
346-acre plot of forested area
Recreation space: 29% of the area
Residential space: 46%
Concrete streets: 12%
Time of concentration for the drainage area =3.5 hours
Designed for a storm of 100-yr frequency.
Based on these development plans, determine a suitable cross-section for a channel to carry the estimated runoff determined in Part A if the slope of the channel is 1% and Manning's coefficient of roughness is 0.016. Assume a 6-foot width. What is the required depth of the drain?
Answer: ftsubm
n 2 5 Recall the development plans previously

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!