Question: need a gantt chart base on the data with the shapes showed at top of 3rd picture .tnx 5 6 oplo Noo Door Mirror Assembly



need a gantt chart base on the data with the shapes showed at top of 3rd picture .tnx
5 6 oplo Noo Door Mirror Assembly 4 Task Name Duration Predecessors 1 Door Mirror Assembly O days 2 Design Door Mirror Ass'y 5 days 1 7 3 Door Casing Mold o days 2 9 4 Design Casing Mold 2 days 3 5 Build Casing Mold 5 days 1 6 Purchase Raw Material 2 days 4 7 Run Sample Casings 1 day 5,6 8 QC Check Sample Casing 1 day 7 9 Run Production Casing 3 days 15 16 10 REFLECTIVE MIRROR 0 days 17 11 Mirror - Existing - In Stock 0 days 10 18 19 12 CAMERA INTERFACE 0 days 20 13 Design Interface 3 days 21 14 Build Interface 2 days 13 22 15 Install Interface 1 day 23 24 16 CAMERA 0 days 25 17 Design Camera 5 days 26 18 Electrical Cables - Existing o days 27 19 Build Camera 3 days 17,18 28 20 Test Camera 2 days 19 29 30 21 Final Assembly o days 9,11,15,20 31 22 Door Mirror Assembly 3 days 32 23 Inspect Mirror Assembly 1 day 22 33 24 Ship Mirror Assembly 1 day 4 N # Note: Items 1,3,10,12,16, and 21 are titles only they have no duration. 1. Data Sheet 2. Network Network Text Example Ready Accessibility: Investigate P19 > fi D E F G H . K T N 0 R S Q Nm Ai A B 1 Supplier Selection P.E.R.T Network 2 3 A Assemble Project Team 1 Wk Identify Potential Commodity B 3 wk 4 Supplier Develop Supplier Evaluation C 1 Wk 5 Criteria . E B A D 1 wk 6 E 1 wk B 7 A F G F 3 WK E,D 8 G 9 Develop Supplier Audit Form Perform Preliminary Supplier Financial Analysis Conduct Supplier Site Visits Compile Results from Site Visits Identify Requirements for Supplier Performance System Perform Detailed Analysis and Programming Test Computer System 1 WK F C D H 3 Wks A 10 3 Wks H 11 12 1 Wks 1 K Select Final Suppliers H 13 1 wk 11 GJ J 14 15 16 17 18 + 19 20 21 22 23 o P S M R N G D B H E F Non Critical Activity Slack or Float Mileston Critical Path Activit Progress Date line Base line 2 3 5. 5 7 Predecess lors Door Mirror Assembly Task Name Duration 1 Door Mirror Assembly 2 Design Door Mirror Ass'y 5 days 0 days B Please see comments at the bottom of the page 1 0 o days 2 Door Casing Mold 1 3 24 Design Casing Mold 5 Build Casing Mold 2 days 3 5 days 4 46 Purchase Raw Material 2 days 4 1 day 5,6 7 Run Sample Casings 58 QC Check Sample Casing 1 day 7 9 Run Production Casing 3 days 8 REFLECTIVE MIRROR 9 10 10 days 2 11 Mirror - Existing - In Stock 0 days 10 12 CAMERA INTERFACE 0 days 2 3 days 12 13 Design Interface 14 Build Interface 2 days 13 15 Install Interface 1 day 14 2 16 16 CAMERA O days 17 Design Camera 5 days 18 Electrical Cables - Existing 0 days 19 Build Camera 3 days 20 Test Camera 2 days 17 17,18 19 21 Final Assembly O days 9,11,15,20 22 Door Mirror Assembly 3 days 21 23. Inspect Mirror Assembly 24. Ship Mirror Assembly 1 day 1 day 22 23Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock