Question: Need in MS Project. A project is building a three storey, five bedroom residential building. The duration is from 28/07/21 to 02/05/24 - No need
Need in MS Project. A project is building a three storey, five bedroom residential building.
The duration is from 28/07/21 to 02/05/24 -
No need to be very detailed
- it should show critical path
- produce Bar Chart showing Critical Path, Start and End Dates, any Milestone dates, etc
- No need for costs
- showing concept design, techincal design, contracts etc
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
