Question: need steps 6-8 Case Part B: Quality Control Analytics As part of the process for improving the quality of their cars, engineers have identified a
need steps 6-8
Case Part B: Quality Control Analytics As part of the process for improving the quality of their cars, engineers have identified a potential improvement to the process that makes a washer that is used in the accelerator assembly. The tolerances on the thickness of the washer are fairly large since the fit can be loose, but if it does happen to get too large, it can cause the accelerator to bind and create a potential problem for the driver. (Note: This part of the case has been fabricated for teaching purposes.) Let's assume that as a first step to improving the process, a sample of 40 washers coming from the machine that produces the washers was taken and the thickness measured in millimeters. The following table has the measurements from the sample: Questions 6. Set up X and range control charts for the current process. Assume the operators will take samples of 10 washers at a time. 7. Plot the data on your control charts. Does the current process appear to be in control? 8. If the process could be improved so that the standard deviation were only about 0.10 millimeter. what would be the best that could be expected with the processes relative to the fraction defective

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
