Question: new answer please dont copy an old answer construction managament question new answers please Applied Science University decided to construct a new building including two
new answer please dont copy an old answer
construction managament question new answers please
Applied Science University decided to construct a new building including two floors as a health club and another two underground floors as a parking for students. The university was thinking to assigned a design office to provide the full set of design drawings before start looking for a well experienced construction contractor. The university will do all it can to launch a new project for students at the beginning of second semester 2022 which requires a very tight schedule If you were hired by ASU as the owner project manager: a. Illustrato what type of contract will support your tight schedule and why? ( 5 Marks) b. Classify the owner's list of major project execution activities as per the selected schedule and contract type? (5 marks) c. Propose the Project organizational chart identifying the relationship between the ASU, and other contractors as per your suggested contract? (4 Marks) d. A construction project includes numerous of parameters to be controlled, as a construction manager you were requested to propose a systematic process used to measure the performance of a project at different times throughout the life cycle of a project including the project schedule and budget. Explain (6 Marks) Support your answer with a graph illustrate the relationship between the schedule and the budget
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock