Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, five percent; delay, eight
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, five percent; delay, eight percent. Use the Work Measurement Excel template to determine the standard time for this operation.
Work Observation
Element Performance Rating
A
B
C
D
E
F
Round your answer to two decimal places.
minutesNine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, five
percent; delay, eight percent. Use the Work Measurement Excel template to determine the standard time for this operation.
Work
Round your answer to two decimal places.
minutes
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock