Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, five percent; delay, eight
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, five percent; delay, eight percent. Use the Work Measurement Excel template to determine the standard time for this operation.

line observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue ve percent; delay, eight percent. Use the Work Measurement Excel template to determine the standard time for this operation. ound your answer to two decila places. minutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts