Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, 5 percent; fatigue, 5 percent; delay, 1

Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, 5 percent; fatigue, 5 percent; delay, 10 percent.
\table[[Work,Observation,,],[Element,1,2,3,4,5,6,7,8,9,Performance Rating],[A,0.09,0.12,0.08,0.11,0.10,0.09,0.13,0.12,0.13,105%