Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, six percent; delay, five

Nine observations from a work measurement study

Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, six percent; fatigue, six percent; delay, five percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Observation Element 1 2 3 4 5 6 7 8 9 Performance Rating A 0.11 0.15 0.10 0.08 0.12 0.11 0.16 0.15 0.16 85% B 0.23 0.18 0.21 0.21 0.27 0.22 0.26 0.25 0.25 90% 0.47 0.51 0.47 0.46 0.50 0.50 0.51 0.47 0.51 100% D D 0.62 0.67 0.63 0.62 0.70 0.69 0.69 0.67 0.73 105% E 0.700.77 0.73 0.68 0.82 0.80 0.77 0.79 0.83 105% F 1.02 1.02 1.00 0.99 1.10 1.11 1.02 1.07 1.09 115% Round your answer to two decimal places. 4.11 minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!