Question: note:LCLx was incorrect. b) Based on the x chart the wire cutting process has been? out of control or in control c) the control limits


note:LCLx was incorrect.
b) Based on the x chart the wire cutting process has been? out of control or in control
c) the control limits for the 3-sigma chart are (round all intermidate calculations to 3 decimal places)
UCLr=? inches
LCLr=? inches
d) based on the r chart, the wire cutting process has been? out of control or in control
Refer to Table 56.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour 1 2 3 AWN- R 3.25" 0.76" 3.20 1.23 3.12 1.48 3.291.31 3.07 1.22 2.86 0.37 Hour 7 8 9 10 11 12 R 0.48" 1.18 0.76 1.33 1.12 0.45 2.95" 2.55 3.02 2.75 2.83 2.87 Hour 13 14 15 16 17 18 21 R Hour 0.90" 19 1.36 | 202 1.11 0.55 22 1.38 23 2 1.24 24 .01" 2.73 3.22 2.84 2.76 2.84 3.31" .89 2.55 3.38 .94 2.64 R 1.66" 1.09 1.03 0.41 1.58 1.02 Based on the sampling done, the control limits for 3-sigmax chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL;-) = 3.713 inches (round your response to three decimal places). Lower Control Limit (LCL,) = 2.789 inches (round your response to three decimal places). Definition Mean Factor, Upper Range, Lower Range, Sample Size, n A2 D4 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 0.266 OOOO NOWN 3.268 2.574 2.282 2.115 2.004 1.924 1.864 1.816 1.777 1.716 0.076 0.136 0.184 0.223 0.284 Print Done
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts