Question: o A Test Sex Engineering designs and constructs ar condrioning and healing (HVAC) systems for hospitals and clinics. Currently the company's staff is overloaded with

o A Test Sex Engineering designs and constructs ar condrioning and healing (HVAC) systems for hospitals and clinics. Currently the company's staff is overloaded with design work. There is a major design project due in 7 weeks. The penalty for completing the designate is 514,000 per week since any delay will cause the facility to open later than anticipated and cost the clont significant revenue. If the company uses its inside engineers to complete the design it will have to pay them wertime for all work Sox has estimated that it will cost $13,000 per week (wages and overhead, including late works to have company engineers complete the design. Sox is also considering having an outside engineering firm do the design Abid of $85.000 has been received for the completed design. Yet another option for completing the design is to conduct a design by having a thind engineering company complete al electromechanical components of the design at a cost or $54.000. Sex would then complete the rest of the design and control systems at an estimated cost of $30.000 Sox has estimated the following probabilities of completing the project within various time frames when using each of the options. These estimates are shown in the following table Probability of Completing the Design Option On Time One Week Late Two Weeks Late Three Weeks Late Intemal Engineers 0.4 0.5 0.1 Extemal Engineers 0.1 05 03 Jolet Design 0.1 04 03 02 The expected monetary value ising incide engineers to complete the design is (Ender your response as an integer) Gradebod Scor see score
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock