Objective: The objective of this project is to develop and evaluate a new storm sewer system for a recently constructed commercial area. The design will incorporate considerations based on a year return period.
Statement: The commercial site under consideration spans a total area of acres, with the breakdown as follows: dedicated to parking lots, occupied by buildings, and the remaining consisting of open grass areas. The general slope of this area is The time of concentration for the site is estimated to be minutes. The IntensityDurationFrequency IDF curve for the area is provided below.
Deliverables:
Stormwater Sewer System Design Calculations:
Hydraulic calculations including peak flow rates, runoff volumes, and pipe sizing based on the year return period. Consideration of site characteristics such as area coverage, time of concentration, and IDF curve.
Alternative Pipe Options:
Option : Reinforced concrete pipes.
Option : PVC pipes.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock