Question: Old MathJax webview Given the time-phased work packages and network, complete the baseline budget for the project. WP Design 4 5 2 N WP Survey
Old MathJax webview




Given the time-phased work packages and network, complete the baseline budget for the project. WP Design 4 5 2 N WP Survey 2. 2 4 4 4 5 WP Report 3 3 2 -6 %media:ex8-9network.jpg% Note: Leave no blanks for answers: enter 0 (the digit, not the letter) where necessary. es Time-phased budget ($ 000) Week Week 4 Week 5 Week 6 Week 7 Week 9 Week 8 Week 10 Week 11 Week 12 Task Budget Week 2 Week 1 Week 3 11 4 5 2 21 Design Survey Report Total Cumulative 8 40 You have prepared the following schedule for a project in which the key resource is a tractor. There are three tractors available to the project. The resource requirements are as shown in the diagrams below. Develop a resource-constrained schedule. Use the parallel method and heuristics given. Be sure to update each period as the computer would do. Legend ES 10 EF SLK RESIS LS DURU 2 2 13 2 3 2 7 4 0 2 2 1 1 2 2 2 4 4 7 4 1 0 7 0 7 2 0 0 7 4 1 1 0 0 2 2 4 0 4 0 4 1 5 5 2 2 6 1 7 Use the following order of heuristics: 1. Minimum slack, 2. Smallest duration, 3. Lowest identification number Schedule resource load chart with ES and slack updates 10 Resource Duration ESLF SLTP 1 TP 2 TP TP TP TP 6 TP 7 TP8 TP 9 TP 10 TP 11 TP 12 TP 13 TP 14 TP 15 TP 16 1 1 2 0 4 2 2 4 0 4 3. 2 3 2 7 4 1 3 4 7 5 2 2 4 6 2 1 7 8. Venlo 2 0 2010 H Use the following order of heuristics: 1. Minimum slack, 2. Smallest duration, 3. Lowest identification number Schedule resource load chart with ES and slack updates 5:28 ID Resource Duration ES UF SLTP 1 TP2 TP 3 TP 4 TP STP 6 TP 7 TP8 TP 9 TP 10 TP 11 TP 12 TP 13 TP 14 TP 15 TP 16 1 1 2 0 4 2 2 2 4 0 4 0 3 2 2 7 2 4 1 3 4. 7 0 5 2 2 4. 7 1 6 2 1 7 8 0 nces lonlon 3 ta Covela Note: Recall, in the schedule resource load chart the time-constrained scheduling interval (ES through CF) has been shaded. Any resource scheduled beyond the shaded area will delay the project. "TP" stands for time period. How long will the project take if it was NOT resource-constrained? time periods time periods 1:05:15 How long will the resource-constrained project take? erences time periods List the order in which you scheduled the activities of the resource-constrained project. First Second Third Fourth Fifth Sixth
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock