Question: On a small gas station project .Develop a work breakdown structure and a corresponding AON network Develop WBS and AON diagram to the level of
On a small gas station project .Develop a work breakdown structure and a corresponding AON network
Develop WBS and AON diagram to the level of detail you feel sufficient.
Attached Table 1 & 2 will help and thanks
please which more information ?
Table 1: Work Units for the Gas Station Project (1) Earthwork for Parking Service (P&S) Area (11) Interior Painting (2) Asphalt Paving for P&S Area (12) Interior Drywall (3) Concrete Hardstands in P&S Area (13) Interior Doors, Frames, Hardware, etc. (4) Concrete Foundations (14) Interior Floor Coverings (if reqr'd) (5) Walls-Masonry Bearing Walls (15) Exterior Brick Faade (6) Walls-Prefab Metal Sandwich Panels (16) Exterior Glazing (7) Interior Concrete Floors (17) Exterior Doors and Signage (8) Built-up Roof (18) Mechanical Systems (9) Roof Gutters/Drainage (19) Electrical Systems (10) Interior Built-ins (e.g., Cabinets, etc.) Table 2: Mechanical Systems Individual Work Units (1) Excavation of waste water system (2) Drainage tile installation - waste water (3) Septic tank installation (4) Fresh water lines (piping) (5) Sinks, basins, and toilets installation (6) Hot water system installation (7) Pneumatic air system installation
attached table1& 2 is to be used
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock