Question: **ONLY NEED PROBLEM 3** Show work in Excel QM The number of cars arriving per hour at Lundbergs Car Wash during the past 200 hours
**ONLY NEED PROBLEM 3** Show work in Excel QM
The number of cars arriving per hour at Lundbergs Car Wash during the past 200 hours of operation is observed to be the following:
| Number of Cars Arriving | Frequency |
| 3 or fewer | 0 |
| 4 | 20 |
| 5 | 30 |
| 6 | 50 |
| 7 | 60 |
| 8 | 40 |
| 9 or more | 0 |
| Total: | 200 |
- Set up a probability and cumulative probability distribution for the variable of car arrivals.
- Establish random number intervals for the variable.
- Simulate 15 hours of car arrivals and compute the average number of arrivals per hour. Select the random numbers needed from the random number table.
Problem-3:
Compute the expected number of cars arriving in the previous problem using the expected value formula. Compare this with the results obtained in the simulation.