Question: P11-55B Comprehensive standards and variances problem (Learning Objectives 1,2,3,5, & 6) Nautical Awning manufactures awnings and uses a standard cost system. Nautical allocates overhead based
P11-55B Comprehensive standards and variances problem (Learning Objectives 1,2,3,5, & 6) Nautical Awning manufactures awnings and uses a standard cost system. Nautical allocates overhead based on the number of direct labor hours. The following are the company's cost and standards data: Direct material 18.0 yards per awning at $10.00 per yard Direct labor 2.0 hours per awning at $13.00 per hour Variable MOH standard rate $5.00 per direct labor hour Predetermined fixed MOH standard rate $10.00 per direct labor hour Total budgeted fixed MOH cost $34,000 Actual cost and operating data from the most recent month follows: Purchased 35,460 yards at a total cost of $333,324 Used 31,300 yards in producing 1,800 awnings Actual direct labor cost of $45,457 for a total of 3,470 hours Actual variable MOH cost S19,085 Actual fixed MOH cost $39,500 All manufacturing overhead is allocated on the basis of direct labor hours. Requirements 1. Caleulate the standard cost of one awning. 2. Calculate the tollowing variances: a. The direct material variances. b. The direct labor variances. c. The variable manufacturing ovethead variances. d. The fixed manufacturing overhead variances. 3. Explain what each of the variances you calculated means and give at least one possible explanation for each of those variances. Are any of the variances likely to be interrelated
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
