Question: PA 7-2 A machine makes two components, call... A machine makes two components, call them type A and B. It takes 275 seconds to switch

PA 7-2 A machine makes two components, call... A

PA 7-2 A machine makes two components, call... A machine makes two components, call them type A and B. It takes 275 seconds to switch production between the component types. During that time no production occurs. When in production, each unit of A or B requires 0.35 seconds to be completed. The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 0.95 seconds, or 63.16 units per minute. For questions below, (Round answers to nearest whole number.) Suppose the machine rotates between one batch of 1750 units of A and 1750 a. units of B. In that case, what is the capacity of the machine in component pairs component pairs per minute per minute, where a component pair is one unit of A and one unit of B? Suppose the machine rotates between one batch of 1750 units of A and 1750 b. units of B. What is the utilization of the machine? percent C. Suppose the machine rotates between one batch of 1750 units of A and 1750 units of B. What is the average inventory of B components? units d. If the production schedule could be adjusted with the goal of minimizing inventory in the process, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well. units

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!