Question: Page 154 4. Firewall Project XT. Using the complexity weighting scheme shown in Table 5.3 and the function point complexity weight table shown below. estimate

Page 154 4. Firewall Project XT. Using the complexity weighting" scheme shown in Table 5.3 and the function point complexity weight table shown below. estimate the total function point count. Assume historical data suggest five function points equal one person a month and six people can work on the project. Complexity Weight Table Number of inputs 10 Rated complexity low Number of outputs 20 Rated complexity average Number of inquiries 10 Rated complexity average Number of files 30 Rated complexity high Number of interfaces 50 Rated complexity high a. What is the estimated project duration? b. If 20 people are available for the project, what is the estimated project duration? c. If the project must be completed in six months, how many people will be needed for the project? I Chp 6 2. How are WBS and project networks linked on straight to a project network and forget the WBS
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
