Question: Part 1: AON (40 points) AON (Activity on Node) Network diagram using the most likely duration from the table below. The network should only use

Part 1: AON (40 points) AON (Activity on Node)

Part 1: AON (40 points) AON (Activity on Node) Network diagram using the most likely duration from the table below. The network should only use and show defined precedence relationships. Indicate the critical path and calculate the duration of the project. The AON diagram should show the task predecessors and the ES, EF, LS, LF, TS, FF times in a manner similar to the example from the lecture. Note, however, that you are requested to draw the diagram with Most Likely Durations, and thus you may omit the expected time and variance. Also note that network diagrams show durations, not calendar days. All Durations Are In Weeks. No. Task Name Pessimistic Predecessors Optimistic Most Likely 0 5 3 1 2 3 4 0 5 10 20 6 8 15 5 4 5 6 Radar Project Authorized 0 Antenna Design Antenna H/W Design Antenna S/W Design 12 Radar Interface Unit Design Radar Interface 11/W Design 5 Radar Interface S/W Design 12 Receiver Design Receiver Hardware Design 5 Receiver Software Design Design Review 3 Radar Material Acquisition Prototype Manufacturing 7 16 7 6 7 8 9 10 11 12 13 3 1 FS 2 SS + 5 (lag) 2 FS + 5 (lag) 10FS, OFS, 4FS, 3 FS 5 FS 5 FS 1 TS 8 TS 8 SS 6 FS, 7FS 11 FS 12 FS 7 14 5 7 8 4 10 6 10 9 10 6 12 12 8 6 9 You may draw by hand or draw with software such as MS Word, Visio or PowerPoint. You are not allowed to use scheduling software and are limited to a total of two pages

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!