Question: Part III. Problems (15 Points): 7.175 Points) For the schedule shown below: a. Draw the activity on node diagram. b. Perform the CPM calculation. c.

Part III. Problems (15 Points): 7.175 Points) For
Part III. Problems (15 Points): 7.175 Points) For the schedule shown below: a. Draw the activity on node diagram. b. Perform the CPM calculation. c. Calculate the forward and backward pass and total floats. Duration Activity Predecessor A B D B, C E B, C F C G D ,E,F G H I EFI IGH No 000