Question: PART IV ( 2 0 points ) In a CPM network, the critical path was found to include five activities. Their durations are tabulated below

PART IV (20 points)
In a CPM network, the critical path was found to include five activities. Their durations are tabulated below (Table D).
Table D
\table[[Activity,Duration],[\table[[Optimistic],[T0