Question: Playground Project Plan Continued In Lesson 9, you were asked to create a network diagram for a playground project. To continue from the previous lesson,

Playground Project Plan Continued

In Lesson 9, you were asked to create a network diagram for a playground project.

To continue from the previous lesson, do the following:

1. Assign a crash duration to tasks that you feel are feasible to crash.

2. Assign total normal costs and total crash costs to each task.

3. Decrease your total project duration by 15%. This may be accomplished using any of the techniques described in the lesson.

4. Write a short narrative describing how you arrived at your new durations in (1) above and your basis of estimate for costs in (2).

The images below are my Lesson 9 work that is mentioned above.

Playground Project Plan Continued In Lesson 9, you were asked to createa network diagram for a playground project. To continue from the previous

lesson, do the following: 1. Assign a crash duration to tasks thatyou feel are feasible to crash. 2. Assign total normal costs and

1.1 Site preparation 1.1.1 Clearing the land 1.2 Leveling the ground 1.1.3 Installing drainage system 1.2 Playground equipment procurement 1.2.1 Research and selection of equipment 1.2.2 Obtaining quotes and selecting suppliers 1.2.3 Placing orders and arranging delivery 1.3 Installation of playground equipment 1.3.1 Preparing the site for installation 1.3.2 Assembling equipment 1.3.3 Installing equipment 1.4 Safety inspection and testing 1.4.1 Hiring an independent safety inspector 1.4.2 Conducting tests and inspections 1.4.3 Making necessary adjustments and repairs 1.5 Landscaping and finishing 1.5.1 Planting trees and shrubs 1.5.2 Laying grass or artificial turf 1.5.3 Installing benches, trash cans, and other amenities Network Diagram Forward and Backward Pass Short Narrative The network diagram for this project has no critical path, meaning that there is no sequence of tasks that must be completed on time for the project to finish on time. Therefore, the network is relatively insensitive to delays in any individual task. However, delays in the planning phase could potentially delay the start of the entire project, so it is important to ensure that this phase is completed on time. Additionally, delays in the finishing touches phase could delay the opening of the playground to the public

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!