Question: Please answer all questions. Construct AON diagram from the table below. Determine the Critical Path and The Total Duration for this project. *I Need The
Please answer all questions.
Construct AON diagram from the table below. Determine the Critical Path and The Total Duration for this project.
*I Need The AON Diagram Is to be draw By Computer, NOT HANDWRITTEN.




ACTIVITY EVENT DESCRIPTION PRESEDENCE DAYS PLANNING PHASE 30 1. 3 2. 3 3. 6 4. 5 Requirements review Scope defining Budget preparation Schedule preparation Human resource management plan Communication plan Safety management plan Quality management plan 5. 3 6. 6 7. 2 8. 2 DESIGNING PHASE 109 9. Identify land perimeter 7 10. 4,5,6,7,8,9 7 11. 10 7 12. 11 7 13. Design base conceptual structure Design piling structure Design machine tending Design storage station Design assembly station Design quality control station Design welding station 1,2,3 5 14. 12 5 15. 14 5 16. 15 5 17. 16 5 Design toilets Design 2 prayer rooms for Muslim 18. 13 5 19. 18 5 20. 19 5 21. Design loading and unloading bays Design centre Design computer control room Design management office Design production line 20 5 22. 21 5 23. 22 5 5 24. 23 5 25. 24 5 Design meeting room Design plumbing structure for new area Design electronic system new machine Design electric system for new machine 26. 17,25 8 27. 26 8 PURCHASE MATERIAL 112 28. 27 7 We define suitable machine and material for upgrading to the currently machine 29. Find supplier 27 10 30. 28 10 31. 29 30 32. Purchase a new machine Arrival of purchasing machine Purchase a new material Arrival of purchasing material Software CIM purchase for machine 30,31 10 33. 32 32 34. 33 7 35. Checklist of machine ordered 34 3 36. Checklist of material ordered 35 3 RENOVATION PHASE 109 37. 36 7 Estimating budget salary for all workers Preparing PPE equipments 38. 37 5 39. Rent a sideloader 33 5 40. Rent a crane 38 5 41. Buy a forklift 40 10 42. Hiring electrical technician or engineer 39 12 43. 42 14 44. Disassemble all machines Workers clearing the project area Assemble all machines 43 3 45. 42 20 46. Wiring 45 14 47. 44 7 48. Pay salary for the workers Pay salary for the technician and engineer 46 7 CLOSING PHASE 104 49. Moving machine parts to the project 41,47 12 area. 50. 48 30 51. 50 17 Machines assembly on the site. Setup wiring Put Safety Sign and machine standard operation procedure. Machine inspection. 52. 50 7 53. 51 14 54. 52 5 Test run the machine. Cleaning the area 55. 54 7 56. Safety Testing 53,54 7 57. Final Test Of Machine 55,56 5 5