Question: The activities, duration, and cost under normal and accelerated (crashed) conditions for a network diagram are shown in the accompanying table. 1. Determine the critical

The activities, duration, and cost under normal and accelerated (crashed) conditions for a network diagram are shown in the accompanying table.

The activities, duration, and cost under normal

1. Determine the critical path of the project under normal conditions

2. Determine the duration of the project under normal conditions

3. Determine the cost of the project under normal conditions

4. Determine the minimum duration of the project

5. Determine the cost of the project when the duration is minimum?

Notes on answering:

For answering critical path, answer in capital letters only without hyphens,dashes,commas, or any symbols (i.e., ABJKM, AFLKO)

For answering durations and costs, answer in numerical value only without units. (i.e., for durations: 16, 12, 15. for costs: 12000,1500,17500)

Not following instructions in answering will not be considered

The activities, duration, and cost under normal and accelerated crashed conditions for a network diagram are shown in the accompanying table Duration, days Cost, pesos Activity Node Accelerated Normal A 1 to 2 2 6800 B 2 to 3 6 24200 C 2 to 4 8000 4 to 3 6000 3 to 5 5800 5 to 6 7200 3 to 7 8400 7 to 6 4500 6 to 8 9300 3 to 9 5300 9 to 10 29100 8 to 10 1200 10 to 11 8700 D t F G H I J K L M Normal 3 2 5 4 2 7 10 1 3 4 3 2 4 3 1 S 5 7 1 2 Accelerated 7200 26800 8000 6900 5800 7550 9000 5200 9700 5900 32100 1200 9000

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!