Question: Please answer powerpoint questions 1-4. Standard Work Case Study A pizza place has 4 workstations and does the following operations to make a pizza PIZZA

Please answer powerpoint questions 1-4. StandardPlease answer powerpoint questions 1-4. Standard

Please answer powerpoint questions 1-4.

Standard Work Case Study A pizza place has 4 workstations and does the following operations to make a pizza PIZZA PROCESS WORK STATION 1 OPERATION 1 WORK STATION 3 OPERATION 3 WORK STATION 4 OPERATION 4 1. TAKE ORDER 2. RECIEVE PAYMENT Credit card Only WORK STATION 2 OPERATION 2 1. PREPARE DOUGH 2. PROOF DOUGH IN OVEN- 5 SEC 3. APPLY SAUCE 1. PLACE TOPPINGS 2. BAKE IN OVEN -10 SECS 1. PACKAGE 2. HANDOVER TO CUSTOMER 4 Case II 1. In Case II, you assume there are two operators (Operator 1 and Operator 2). Operator 1 handles workstation 1 and 2 and operator 2 handles workstation 3 and 2. Workstation 2 and Workstation 3 has one oven each. 3. There are two auto times, one at workstation 2, proof dough (5 sec) and other one at workstation 3, bake in oven (10 sec). 4. Following assumptions are made: a. Available time after breaks per day is 300 minutes, takt time is 25 seconds A time study of 10 observations revealed the following data: operator 1 performs step 1 thru 7 and operator 2 performs step 8 thru 12 Time Observation Sheet Leader Cover Or hradut 01116 i Seg Description Observation Point 1 1 4 . 7 . 10 1 Take Manuale 7 . 4 4 5 5 5 11 6 6 6 5 . 5 5 10 10 15 15 Marine 3 7 9 4 4 2 7 30 3 2 10 13 13 13 94 13 4 Prepo Manuale 21 16 19 11 20 5 14 34 29 12 Auto Time Prep Auto Time 24 16 21 21 14 14 29 19 24 24 6 Apply Savce Manual Time 15 15 23 20 25 25 27 27 23 23 31 7 PARANORR Wat te workstation walking Time 31 20 22 14 25 . SELASANANA Place Tones Manual Time 27 19 37 alaASAS 3598 27 37 17 21 21 16 15 11 17 At Time Bak Auto Time 45 10 ARRA 3 was to work studion e Walking Time 4 99 50 40 40 44 lelalt Package Deliver 31 51 54 54 Manuale 33 4 S3 53 QOCBG wak to work in Wagne BE 51 46 Geserved Cycle Time 50 53 $ Prepare a PowerPoint presentation to answer and demonstrate the following. Must show calculations for all: 1. Is operator a bottleneck? Build a Yamizumi chart to support your answer. How can you reorganize your work elements to balance operator loads? 2. Demonstrate your part flow by preparing a standard work chart 3. With the current operators and machine capacity can we meet the takt time? Support your answer by making a standard work combination table for each operator. 4. Conclusion, including your analysis and recommendation Deliverables 1. You can combine slides of case I and case II to one PowerPoint presentation and submit using assignment tab in blackboard. Standard Work Case Study A pizza place has 4 workstations and does the following operations to make a pizza PIZZA PROCESS WORK STATION 1 OPERATION 1 WORK STATION 3 OPERATION 3 WORK STATION 4 OPERATION 4 1. TAKE ORDER 2. RECIEVE PAYMENT Credit card Only WORK STATION 2 OPERATION 2 1. PREPARE DOUGH 2. PROOF DOUGH IN OVEN- 5 SEC 3. APPLY SAUCE 1. PLACE TOPPINGS 2. BAKE IN OVEN -10 SECS 1. PACKAGE 2. HANDOVER TO CUSTOMER 4 Case II 1. In Case II, you assume there are two operators (Operator 1 and Operator 2). Operator 1 handles workstation 1 and 2 and operator 2 handles workstation 3 and 2. Workstation 2 and Workstation 3 has one oven each. 3. There are two auto times, one at workstation 2, proof dough (5 sec) and other one at workstation 3, bake in oven (10 sec). 4. Following assumptions are made: a. Available time after breaks per day is 300 minutes, takt time is 25 seconds A time study of 10 observations revealed the following data: operator 1 performs step 1 thru 7 and operator 2 performs step 8 thru 12 Time Observation Sheet Leader Cover Or hradut 01116 i Seg Description Observation Point 1 1 4 . 7 . 10 1 Take Manuale 7 . 4 4 5 5 5 11 6 6 6 5 . 5 5 10 10 15 15 Marine 3 7 9 4 4 2 7 30 3 2 10 13 13 13 94 13 4 Prepo Manuale 21 16 19 11 20 5 14 34 29 12 Auto Time Prep Auto Time 24 16 21 21 14 14 29 19 24 24 6 Apply Savce Manual Time 15 15 23 20 25 25 27 27 23 23 31 7 PARANORR Wat te workstation walking Time 31 20 22 14 25 . SELASANANA Place Tones Manual Time 27 19 37 alaASAS 3598 27 37 17 21 21 16 15 11 17 At Time Bak Auto Time 45 10 ARRA 3 was to work studion e Walking Time 4 99 50 40 40 44 lelalt Package Deliver 31 51 54 54 Manuale 33 4 S3 53 QOCBG wak to work in Wagne BE 51 46 Geserved Cycle Time 50 53 $ Prepare a PowerPoint presentation to answer and demonstrate the following. Must show calculations for all: 1. Is operator a bottleneck? Build a Yamizumi chart to support your answer. How can you reorganize your work elements to balance operator loads? 2. Demonstrate your part flow by preparing a standard work chart 3. With the current operators and machine capacity can we meet the takt time? Support your answer by making a standard work combination table for each operator. 4. Conclusion, including your analysis and recommendation Deliverables 1. You can combine slides of case I and case II to one PowerPoint presentation and submit using assignment tab in blackboard

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!