Question: Please review and answer question #2. Create a step by step crash plan using a network diagram of the high level milestones for each scenario.

Please review and answer question #2. Create a step by step crash plan using a network diagram of the high level milestones for each scenario.

Please review and answer question #2. Create a step by step crash

5.3 The Project: How do we reduce the project's duration? (GRP) 100 Possible Points Due: Sun Sep 11, 2022 11:59pm Attempt 1 IN PROGRESS Next Up: Submit Assignment EN Add Comment Activity Instructions Note: Refer to the Airport Wireless Project page as needed. Activity 1: Project Crashing The project team has discussed options for reducing the project schedule. After some brainstorming and communication with suppliers, the team has arrived at a list of scheduled activities that could be reduced along with a rough estimate of the cost percentage multiplier required to reduce each activity. Use the crash list along with the high-level milestones used for the PERT analysis in WP2. Brainstorm within the team to identify three options to present to the client. Option 1 is the highest schedule reduction/highest cost, Option 2 is the lowest schedule reduction with the lowest cost, and Option 3 is somewhere in the middle. Document all three options. You will find the list on the WP 5.3 Crash List page. Activity 2: Step-by-Step Crash Plan Create a step-by-step crash plan using a network diagram of the high-level milestones for each scenario in Activity 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!