Question: please show all work 1. Given the following data (time) in seconds in a production process: B(16) D(8) A(18) F (14) G(22) C110 E(14) For

please show all work 1. Given the following data
please show all work
1. Given the following data (time) in seconds in a production process: B(16) D(8) A(18) F (14) G(22) C110 E(14) For ten hours of operating time per day, a) What is the cycle time to produce 1000 units of the item? b) What is the minimum number of work stations required? (see formula in the book) c) Balance the assembly line using the longest processing time rule. Use the most number of following task as the tie breaker. Please watch the example video for this chapter and show your work on the line balancing table. The line balancing table should have the following: W/S Time remaining Eligible Will Fit Assign d) What is the efficiency of the line after it has been balanced? Idle 2. As a part of a renovation project, an engineering department has been asked to balance a revised assembly operation to produce an output of 240 units per eight hour day. The precedence diagram and the time needed (in minutes) to do each activity is shown below. A(0.2) B(0.4) C10.2) F(1.2) G(1.6) D(1.2) E(1.4) a) Determine the minimum and the maximum cycle time. b) Determine the minimum and the maximum output possible for this assembly operation. c) Determine the minimum number of work stations needed to produce the 240 units (see formula in the book). d) Balance the line using the longest processing time rule. Use the most number of following task as the tie breaker. Show your work on the line balancing table. e) What is the efficiency of the line

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!