Question: please solve completely, clearly and with understandable solutions, PLEASEE Case 1: Coseider the flash dict llation probiem as llustrated below. The liquid and vapor ander

please solve completely, clearly and with understandable solutions, PLEASEE
please solve completely, clearly and with understandable solutions, PLEASEE Case 1: Coseider

Case 1: Coseider the flash dict llation probiem as llustrated below. The liquid and vapor ander tonsiferation are farmable. A hich level of liquid in the vesel may tesult in overpressuriation of the vessel. - The following basic process control sptems are implemented in the proceis: Transmitter 11 measures the level and manbulates the outlet flow watve frake vi) to maintais the kevel 9. Transmitters F4 and P1 meapure the owerhead line fow and pressere respectively and masipulate the overhead ovtlet flow valve (watre vas to maritain the flow and pressure - A high-pressure alarm (not shown in the dagram) is also implemented to alet the operator to take appropriate action. - If the operator fails to respond, a presure relef walme is inutalied inot shome in the diagramb to release the materibk in the vassel to the atmosghere ind than grevent the vessel's failure. The management seecifies the safety taget level as the "probebility of rebase to the atmosohele to be not greater than 104 per vear". The release inta the atmosphere can cause Lerious permanent injury ta ote or more persont and can retult in the deuth of ene peras at well as causing temporary damage to the environment. The vessel is not holated, and slant personne! we aways exposed to possable accidents. There are no other meallerei in place 10 avoid or minimine the expasure of plant personnet. The frequency of the occumence of ralease an be considered low. can be considered low. - Part 1: Use the risk gaph method to determine the SIL requirement for the flash distiliation process. - Part 2- Use the 3-Dimensional risk matrix method to determine the Sil resuirement and compare it with that from the risk graph method. - Part 3: Draw an event tree to determine whether the exioting safety tystems meet the safety requirement of 'probabity of release to the atmosphere to be not peater than 10-4 per year'. - Part 4 : Draw a n event tree with an addtional StS with SIL obtained usire the rigk gragh or tisk matrix method to determine whether the modified process will meet the safuty requirement. - Part 5: Camment on whether a dike will be helplul to meet the salety requirement. Case 2: Based on the above salety requirment you are mucned to design a sis for the flant distiliation process. - Part 1: abentify the ses and the coriqupending sir your in inplenent ta provert ever pressurization of the wesel, Expleit your selected 515. - Part 2: isentify the required alements of the 515 . determine the required configuration of the SIS to meet the desired st of the sufety function fuse the sirpiled eauatisnd function zuse the simplitied equations). Additional infsmation: 1. From a fautt tree analyis, the probabilitr of over-pressuriation of the ressel =m. determined as b.1. 2. The failure rate of the alarm system, oserator and uafety relief walke are 102,102, and 10t, respettively. 3. The MTTt ef valves and presbure transmitten are so year. 4. You cin astume a teit interval of 2 years

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!