Question: PLEASE SOLVE IT FAST 15.35 Three models, A, B, and C, are to be assembled on a mixed-model line. Hourly production rates for the three

PLEASE SOLVE IT FASTPLEASE SOLVE IT FAST 15.35 Three models, A, B,

15.35 Three models, A, B, and C, are to be assembled on a mixed-model line. Hourly production rates for the three models are: A, 15 units/hr, B, 10 units/hr, and C, 5 units/hr. The work ele- ments, element times, and precedence requirements are given in the following table. Assume E = 1.0, E, = 1.0, and M; = 1. (a) Construct the precedence diagram for each model and for all three models combined into one diagram. (b) Find the theoretical minimum number of workstations required to achieve the required production rate. (c) Use the Kilbridge and Wester method to solve the line balancing problem. (d) Determine the balance efficiency for the solution in (c). Chap. 15 / Manual Assembly Lines Preceded by Preceded by Tock Preceded by Element 1 2 3 4 5 6 0.6 min 0.5 min 0.9 min 1 1 TeBK 0.6 min 0.5 min 0.9 min 0.5 min 1 1 1 0.6 min 0.5 min 0.9 min 1 1 0.7 min 1.3 min WN 2 3 0.7 min 1.3 min 0.9 min AWN 2 3 4 0.6 min 0.7 min 1.3 min WN - 1 2 3 8 000 10 0.8 min 5 6,7,9 6,7 0.8 min 1.2 min 0.8 min 6.6 min 6, 7, 8 Twc 4.8 min 6.2 min

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!