Question: please solve this qustion 2. Considering a system with five processes P0 through P4 and three resources types A,B,C. Resource type A has 9 instances,
please solve this qustion

2. Considering a system with five processes P0 through P4 and three resources types A,B,C. Resource type A has 9 instances, B has 13 instances and C has 10 instances. Suppose at time to following snapshot of the system has been taken: By applying Banker's algorithm 1. What will be the content of need matrix? 2. Is the system in safe state? If yes, then what is the safe sequence